Sunday, February 7, 2010

Tiling the little bathroom...




For some time now, we've be renovating the little bathroom on the lower level of our house which is where our art workshop is located, as well as the exit to the backyard, gardens firepit, BBQ and so forth.

I am in the final stages of tiling, with Ben's assistance. Yesterday I spent 4 hours working on the floor. There's a dozen or so places that still need special cuts and then it can be grouted. Laying floor tile in this little 6 'X 6' space requires one to be a contortionist. I am stiff today.

Getting pictures in this tiny space is also tricky.
The first pic is the shower head/shower walls, pic 2 is the corner showing the shower base (the curb still needs tiling), and the third pic is the floor where the pedestal sink will be. The floor is the brown tile; the shower walls are parchment color with a row of accent tiles at eye level.

I'm no pro at this but I think it is coming out decently well. Ben will be back later this week and hopefully we'll wrap it up.

Getting ready for backyard parties and summer wedding visitors. Yay!!

No comments: